An intermittent problem nobody can pin down
It happens often enough to matter and rarely enough that nobody's caught it in the act.
Enterprise engineering
When connectivity, segmentation or platform integration is limiting the business, Kritical assesses and changes the network around application requirements, so your team can resolve the constraint and operate it with confidence afterwards.
On this page
Jump to the part that matches the problem or decision in front of you.
It happens often enough to matter and rarely enough that nobody's caught it in the act.
Flat access that made sense five years ago is now a real exposure.
Connectivity has to be right before anything else in the move can be sequenced.
Start with topology, addressing, routing, connectivity and the services affected. A useful baseline brings together configuration and observed behaviour, including intermittent problems a diagram can't explain. We scope troubleshooting or an assessment to identify the relevant constraints before proposing equipment changes or a redesign. Where visibility is limited, the assessment identifies what additional evidence is needed and how to collect it.
Segmentation follows the relationships between users, applications, administration and external services. We define permitted traffic and the operational processes needed to maintain it. The design may involve campus, data-centre, branch or cloud interfaces, with routing, resilience, naming and monitoring considered together rather than as separate configuration tasks.
Engineers who work on both the data centre core and the campus edge can trace a fault that lives in the join between them.
Data centre switching and ACI fabrics alongside Catalyst campus cores, including where spanning tree has to be carried across the boundary.
Load balancers and web application firewalls for public-facing applications, including SSL handling and traffic rules.
Name resolution and PKI treated as part of the network, because many mystery outages trace back to one of them.
Loops, spanning-tree faults and intermittent drops traced to cause, not just rebooted away.
A network change needs a plan for management access as well as production traffic.
Plan management access as well as production traffic.
Agree sequencing and the maintenance window before the change.
Retain the configuration needed to support recovery.
Define the conditions for rollback before cutover.
A scoped assessment or change is quoted in writing before work starts. Acceptance verifies agreed application flows, administrative access and failure scenarios within the project scope. Handover can include topology and addressing records, configuration changes, test evidence and operating instructions, with capacity, monitoring and support responsibilities made explicit.
We confirm the affected services, timing and available telemetry, and whether this needs observation over a period.
Send the systems and constraints involved and we quote the work, not just a licence.
Use these guides to see which technologies can help with the job in front of you.
Monitoring and observability shaped around the systems your team runs and the alerts they need to act on.
Yes. A scoped investigation starts with the affected services, timing, recent changes and available telemetry. Some issues require observation over an agreed period.
Yes. We define the technical interfaces and coordinate dependencies while each supplier retains its agreed delivery and support obligations.
That depends on the design and change. The plan identifies expected interruptions, constraints and recovery options before implementation is approved.
Yes, but it requires mapping what depends on today's flat access first. We test the design against real traffic before it's enforced.
Yes. Campus, branch, data-centre and cloud interfaces are considered together where they affect the same services.
Yes. An assessment establishes the actual traffic patterns, failure modes and dependencies first, so the refresh is sized against a real requirement rather than a vendor's default recommendation.
The assessment identifies where the fault domain sits, including third-party circuits, and coordinates the evidence needed to hold the responsible supplier to their own service commitment.
Yes. Multi-site connectivity, routing and failover are assessed as part of the same design, with each site's dependencies and recovery path made explicit.
Tell us what you want to achieve, what you have today and when it matters.