Assessment and capacity
A current-state review of racks, power, cooling, cabling and connectivity, with capacity and lifecycle gaps called out.
Enterprise engineering
When a room needs planning, filling or maintaining and your own people cannot be on site, Kritical plans the commissioning and decommissioning of physical data centres, then puts hands on the equipment: rack and stack, cabling, backup media changes and remote hands. Kritical plans the room and also carries out the work on the floor, so the room keeps running.
On this page
Jump to the part that matches the problem or decision in front of you.
You might need a plan, a pair of hands, or both.
A room is coming online or closing, and nobody has mapped what happens in what order.
Equipment needs installing, swapping or cabling, and the nearest engineer is hours away.
Tapes or drives need changing, or a faulty part swapping, without your staff making the trip.
An incident, a lease ending or a high-density AI workload has raised the question of whether the room can cope.
Before equipment is bought or moved, we establish which workloads, availability targets and growth assumptions the room must support.
A current-state review of racks, power, cooling, cabling and connectivity, with capacity and lifecycle gaps called out.
Rack layout, cabling, monitoring and acceptance tests agreed before the room goes into service.
Dependency mapping, sanitisation planning, migration sequencing and trade coordination, so a room closes without taking a service with it.
From many rooms to fewer, or one provider to another, with a named recovery path if the cutover goes wrong.
We set out the IT requirements and coordinate the licensed trades who design and install the work.
Rack elevations, cable schedules and operating notes your team can actually use.
Power, UPS and generator paths, HVAC, fire systems, access, cabling and monitoring all decide what the IT platform can deliver. We turn the workload plan into an IT requirements brief and coordinate it with designers and contractors. To be plain about it, we advise and coordinate: licensed electrical, mechanical and fire work is done by appropriately licensed trades, not by us.
We expose rack density, power, cooling, storage, network and support dependencies before a GPU or HPC cluster is purchased.
Kritical plans the room and also carries out the work on the floor. Book a visit, or a regular schedule, and your racks get attention without you travelling.
Servers, storage, switches and PDUs unpacked, racked, powered and cabled to your plan.
Patch cabling, tidy-up and clear labels; structured cabling through registered cablers, coordinated by us.
New equipment in, failed or end-of-life equipment out, with the change recorded.
Tape and drive changes to your written procedure, with media logged and rotated.
You tell us what to do by phone or ticket. We do it, check it and report back on what we saw.
Regular visits on a timetable, and urgent attendance by arrangement.
We cover the Melbourne and Geelong data centre belts, and attend major Australian data centre locations by arrangement. Tell us the site, its access rules and the date that matters, and we confirm what is possible.
If the plan calls for equipment, we can quote it and install it, so one team stays accountable.

Switching, servers and storage for the room, matched to the workload.

Business hardware and the software to run it, quoted together.
Licences, subscriptions and the support that goes with them.
NVIDIA and other GPU platforms are assessed against the workload and the site, with trade and platform specialists engaged where their qualifications are required.
We work out what the site can support and what must change.
We put suppliers, contractors and platform teams on one plan.
We demonstrate the agreed workload and recovery procedures before handover.
We support upgrades, capacity and security improvement after go-live.
Kritical's director spent more than a decade as technical owner of active/active data centres, physical and logical, and ran a dual-data-centre private cloud for a multi-site health alliance.
We plan the move around what must stay available, not around what's convenient for the contractor's schedule.

Racks, power, connectivity, equipment order and application dependencies, mapped before the cutover date is fixed.
Agreed before anything changes, not improvised on the night.
We aim to provide continuity through a consistent lead or delivery group where the agreed scope and service model support it. Your proposal sets out the contact model, cover and handover arrangements that apply.
A first engagement is quoted in writing. Depending on scope it can produce a workload brief, a cable and connectivity schedule, a dependencies register, a commissioning checklist and an operating handover. Field work is quoted in writing too, as a one-off visit or a regular schedule. Monitoring, maintenance access and incident escalation are assigned explicitly.
Bring the site, the equipment involved and the date that matters.
We confirm whether you need a plan, hands on the floor or both, and what access the site requires.
A scoped assessment, a commissioning or exit plan, or a first site visit, priced in writing before it starts.
Request a data centre quote, or ask us about remote hands. Send the site, the equipment and the date that matters.
Use these guides to see which technologies can help with the job in front of you.
Monitoring and observability shaped around the systems your team runs and the alerts they need to act on.
No. We advise and coordinate. Licensed electricians, mechanical and fire contractors do the regulated work. We set out the IT requirements they build around, coordinate the interfaces and check the result against the plan.
The Melbourne and Geelong data centre belts, and major Australian data centre locations by arrangement. Send us the site and we'll confirm.
By arrangement. Urgent attendance depends on the site, its access rules and availability on the day, so we don't promise a fixed response time.
We can plan and manage the decommission: map dependencies, migrate what has to stay, plan equipment sanitisation and coordinate the contractors who remove it. We don't offer disposal certification ourselves.
Yes, as scoped projects. The starting point is the service inventory, site constraints, dependency map and acceptable interruption to each service.
Availability depends on design, operations and external dependencies. We define the target and responsibilities for the work you engage us to deliver; an ongoing service commitment can be scoped separately.
That's normal. The assessment starts by establishing workload, growth and availability requirements before any equipment or site decision is made.
Tell us what you want to achieve, what you have today and when it matters.